Gas Insulated Switchgear is precision advanced technology. It reduces a conventional substation's footprint by up to 10 times, making it the critical solution for space-constrained urban sites, data centre substations, metro infrastructure, and industrial campuses where land is at a premium.
Most EPC contractors in India take GIS orders and then rely entirely on OEM supervisors to execute. Solidus Power is different. Our team has independently delivered GIS substation installation at 220kV, understanding every sequence, every handling requirement, every pre-commissioning check, with OEM partners confirming our execution capability. We pre-empt site requirements before OEM supervisors arrive, not after.
Independent installation and commissioning at EHV level, without full OEM dependency on site.
Space-optimised substation solutions for data centre power infrastructure, critical where footprint and uptime are non-negotiable.
Proven delivery on metro rail and high-density urban infrastructure projects where conventional substations are not viable.
High-precision switchgear installations for manufacturing, processing, and industrial campus power networks.
We show clients the full total cost of ownership, not just capital cost, so the GIS investment decision is grounded in real numbers.
Deep relationships with Siemens, GE, and Hitachi, we speak their language and pre-empt site requirements before they arrive.